Hotels & Resorts

Sheraton World Tower, Orlando

The LPD team provided assistance to the builder on a claim of over $9.5M for moisture and mold related problems.

Gaylord Palms Resort, Orlando

This resort experienced piping problems for which the LPD team diagnosed and provided solutions.

Large 4-star Florida Resort

A 350+ room resort facility with water-intrusion problems requiring fast-track moisture control measures and assessment provided by the LPD team to keep the facility operational.

Resort in Champions Gate Area, Orlando

The LPD team provided assistance to the resort builder who had been experiencing building pressurization and humidity problems.

900+ room Theme Park Resort, Lake Buena Vista

This facility underwent complete renovation of the rooms and corridors in 9 buildings because of mold and moisture problems. The LPD team provided project management and design of the repairs.

1,300+ room Theme Park Resort, Lake Buena Vista

The LPD team provided investigation and solutions for guestroom HVAC problems that had resulted in mold and moisture problems at the end of construction.

3,000+ room Theme Park Resort, Lake Buena Vista

This resort experienced significant guestroom moisture and mold problems and the LPD team provided remediation and design services.

Doubletree Hotel, Orlando

The LPD team provided a full analysis of the storm-related, water-intrusion problems for the owner and the insurance company.

Holiday Inn Airport, Orlando

This hotel experienced problems due to HVAC deficiencies and the LPD team provided investigation and diagnosis of the problem.

Extended Stay America, Various Locations throughout Central Florida

The LPD team provided assistance with the claim of water intrusion through the windows in various Extended Stay America hotels.

Starwood Vistana Village, Orlando

The LPD team provided investigation, repairs, and solutions to water-intrusion problems at this fractional ownership facility.

Marriot Intercontinental Hotel

This hotel experienced problems due to HVAC deficiencies and the LPD team provided investigation and diagnosis of the problem.

Sea Gardens Resort, Florida

The LPD team provided investigation and assisted with solutions and repairs of the rainwater and condensation problems in this fractional ownership facility.

3-Building, 1,000+ rooms Theme Park Resort, Lake Buena Vista

The LPD team provided project management and design of the moisture-related problems in the rooms and corridors that involved both piping and steel structure failures due to condensation.

2,000+ room Theme Park Resort, Lake Buena Vista

The LPD team provided investigative services of building pressurization and HVAC problems at this facility in order to avoid moisture and humidity problems.

East Coast Florida Resort

The LPD team provided for this 400+ room resort facility with water-intrusion problems (storm response) control measures and assessment to return the facility to full operation.

Hyatt Orlando International Airport

The LPD team provided an evaluation of the mold and moisture problems in this facility on behalf of the owner. This included assistance of insurance claim issues.